首页> 美国政府科技报告 >Direct/Delayed Response Project: Field Operations and Quality Assurance Report for Watershed Mapping in the Mid-Appalachian Region of the United States
【24h】

Direct/Delayed Response Project: Field Operations and Quality Assurance Report for Watershed Mapping in the Mid-Appalachian Region of the United States

机译:直接/延迟响应项目:美国中阿巴拉契亚地区流域测绘的现场作业和质量保证报告

获取原文

摘要

The report documents the mapping program of the Direct/Delayed Response Project in the Mid-Appalachian Region of the United States. The objectives of the report is to document the planning activities, field operations, and quality assurance/quality control (QA/QC) of the mapping. The protocols, QA plan, and soil legend for the watershed mapping are presented as appendices.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号