首页> 美国政府科技报告 >Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 4. Cost Analysis. Executive Summary (Revised)
【24h】

Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 4. Cost Analysis. Executive Summary (Revised)

机译:公路桥梁维护,修复和更换优化策略的制定,最终报告。第4卷。成本分析。执行摘要(修订)

获取原文

摘要

The volume is the fourth of a six-volume final report and it presents analyses conducted to develop appropriate cost and timing estimates for various bridge related activities. A computer program was then written so that a life cycle cost analysis can be undertaken to select bridge improvement activities. The titles of all six volumes are listed below: Vol. 1. Elements of Indiana Bridge Management System (IBMS); Vol. 2. A System for Bridge Structural Condition Assessment; Vol. 3. Bridge Traffic Safety Evaluation; Vol. 4. Cost Analysis; Vol. 5. Priority Ranking Method; and Vol. 6. Bridge Performance and Optimization.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号