首页> 美国政府科技报告 >Kingston Fossil Plant Annual Fossil and Hydro Engineering (FHE) Inspection of Ash Disposal Areas, September 1990
【24h】

Kingston Fossil Plant Annual Fossil and Hydro Engineering (FHE) Inspection of Ash Disposal Areas, September 1990

机译:金斯敦化石厂年度化石和水电工程(FHE)灰烬处理区检查,1990年9月

获取原文

摘要

Bottom ash is sluiced into a channel southwest of the active ash disposal area. The bottom settles out in the channel and is removed by dragline, which is subsequently used for dike construction. Fly ash is sluiced into an adjacent channel to the bottom ash channel where it flows into the main ash pond.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号