首页> 美国政府科技报告 >Evaluation of Geocomposite Pavement Panel Drains Installed in a Sand Backfillunder Revised Installation Specification (Revised)
【24h】

Evaluation of Geocomposite Pavement Panel Drains Installed in a Sand Backfillunder Revised Installation Specification (Revised)

机译:根据修订的安装规范(修订)评估安装在沙子回填中的土工复合材料路面板排水

获取原文

摘要

This report discusses the performance of the 1989 revised installationspecification to insure the integrity of the drainage system in Kentucky and in response to the problem on damage to the inner core of the edge drain prior to this revision. It consisted of moving panel to the shoulder of the trench and then flushing a sand slurry into the trench for backfill. Flushing the sand eliminates the need for mechanical compaction. Since 1989, two projects have been completed using the revised note for installation and another is currently under construction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号