首页> 美国政府科技报告 >Design Standards No. 13: Embankment Dams. Chapter 16. Cutoff Walls
【24h】

Design Standards No. 13: Embankment Dams. Chapter 16. Cutoff Walls

机译:设计标准第13号:堤坝。第16章截止墙

获取原文

摘要

Construction of conventional rolled earthfill cutoff trenches can be aprohibitively expensive operation, depending on the required depth and on existing natural groundwater conditions. The recent trend has been toward application of cutoff walls in control of seepage for embankment dams. Cutoff walls can be constructed by a variety of methods that do not require foundation dewatering and greatly reduce the amount of excavation from that required for a rolled earthfill cutoff. This chapter is intended to present general design considerations for the most widely used types of cutoff walls currently accepted as viable alternatives to the more conventional rolled earthfill cutoff trenches.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号