首页> 美国政府科技报告 >IEA Grimethorpe Pressurized Fluidised Bed Test Facility Incident Report: History of Erosion on the Primary and Secondary Quench Vessel Vent Valves
【24h】

IEA Grimethorpe Pressurized Fluidised Bed Test Facility Incident Report: History of Erosion on the Primary and Secondary Quench Vessel Vent Valves

机译:IEa Grimethorpe加压流化床试验设施事故报告:一级和二级淬火船舶排气阀的侵蚀历史

获取原文

摘要

The original vent valves installed on the primary and secondary quench vessels have experienced extensive internal erosion. The report provides details of the engineering work that has been undertaken to overcome the problem. Modifications were made to the valves during hot commissioning in order to reduce the erosive action, but these did not produce a significant improvement. During Test Series One, an alternative valve arrangement was installed which proved successful, and identical valves will be installed at the other locations for Test Series Two. The problem of erosion of the vent valves is likely to be specific only to the wet ash disposal system at the Grimethorpe Facility, as a commercial plant would probably utilize a dry system without the associated cyclone blowdown and venting requirement. (ERA citation 08:020257)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有