首页> 美国政府科技报告 >DOE Small-Scale Hydroelectric Demonstration Program. F.W.E. Stapenhorst Inc., Goodyear Lake Hydroelectric-Generating-Station Redevelopment. Second Annual Report, Operating Year 2, August 11, 1981-August 10, 1982
【24h】

DOE Small-Scale Hydroelectric Demonstration Program. F.W.E. Stapenhorst Inc., Goodyear Lake Hydroelectric-Generating-Station Redevelopment. Second Annual Report, Operating Year 2, August 11, 1981-August 10, 1982

机译:能源部小型水电示范项目。 F.W.E. stapenhorst Inc.,Goodyear Lake水力发电站再开发。第二年度报告,运作第2年,1981年8月11日至1982年8月10日

获取原文

摘要

Monthly and year-long data are presented on the performance, maintenance, power generation, flow conditions, and operating costs during the period from August 11, 1981 to August 10, 1982 at the Goodyear Lake (New York) small-scale hydroelectric power plant. During this period the plant generated 5,806,500 kWh of power for a total income of $194,401, which represents approximately 79% of predicted values. The shortfall in output resulted from the failure of Generator Unit No. 1 which was out of operation for two months. (ERA citation 08:007099)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号