首页> 美国政府科技报告 >TUG FLEET AND GROUND OPERATIONS SCHEDULES AND CONTROLS VOLUMEⅠ:EXECUTIVE SUMMARY
【24h】

TUG FLEET AND GROUND OPERATIONS SCHEDULES AND CONTROLS VOLUMEⅠ:EXECUTIVE SUMMARY

机译:TUG FLEET和地面运行计划和控制第一卷:执行摘要

获取原文

摘要

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases:Tun operational, . Interim Upper Stage (lUS)/Tug fleet utilization, lUS/Tug pay load integration. Tug site activation, lUS/Tug transition. Tug acquisi¬tion. Resource requirements (facility, GSE, TSK, software, man¬power, logistics) are provided in each subplan, as are appropri¬ate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements.

著录项

  • 作者

  • 作者单位
  • 年度 1975
  • 页码 1-79
  • 总页数 79
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号