首页> 美国政府科技报告 >Project control requirements and procedures for major procurement actions Phase C/D System development and production
【24h】

Project control requirements and procedures for major procurement actions Phase C/D System development and production

机译:主要采购行动的项目控制要求和程序C / D阶段系统的开发和生产

获取原文

摘要

This document stipulates the project control requirements and procedures for major procurement actions relating to Phase C/D. It is based on discussions and agreements reached during a series of Working Group meetings Between ESA and EURO SPACE on project control, held during 1975 and 1976. These requirements take account of the experience gained with the project control methods applied to satellite procurement actions during recent years.nThis document is complementary to ESA PSS-32, which covers the respective requirements and procedures for Phase B. Both documents are under the responsibility of the Project Control Division, ESA Head Office.

著录项

  • 作者

  • 作者单位
  • 年度 1977
  • 页码 1-87
  • 总页数 87
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号