首页> 美国政府科技报告 >Space Transportation System Cargo Projects: Inertial Stage/Spacecraft Integrationn Plan. Volume 1: Management Plan
【24h】

Space Transportation System Cargo Projects: Inertial Stage/Spacecraft Integrationn Plan. Volume 1: Management Plan

机译:航天运输系统货物项目:惯性阶段/航天器整合计划。第1卷:管理计划

获取原文

摘要

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and aproval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号