首页> 美国政府科技报告 >Magnetohydrodynamics (Mhd) Engineering Test Facility (Etf) 200 Mwe Power Plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and Schedules
【24h】

Magnetohydrodynamics (Mhd) Engineering Test Facility (Etf) 200 Mwe Power Plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and Schedules

机译:magnetohydrodynamics(mhd)工程测试设施(Etf)200 mwe发电厂。概念设计工程报告(CDER)。第2卷:工程。第3卷:成本和时间表

获取原文

摘要

Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号