Modification of integrated partial payload lifting assembly

机译:集成部分有效负载提升组件的改进

获取原文

摘要

The Integrated Partial Payload Lifting Assembly (IPPLA) is currently used to transport and load experimental payloads into the cargo bay of the Space Shuttle. It is unable to carry the astronaut/passenger tunnel without a structural modification. The purpose of this design is to create a removalbe modification that will allow the IPPLA to lift and carry the passenger tunnel. Modifications evaluated were full-length insert beams which would extend through the existing strongback arms. These beam proposals were eliminated because of high cost and weight. Other proposals evaluated were attachments of cantilever beams to the existing strongback areas. The cantilever proposals reduced cost and weight compared to the full-length modifications. A third method evaluated was to simply make modifications to one side of the IPPLA therefore reducing the materials of the cantilever proposals by 40 percent. The design of the modification selected was completed with two channel beams jointly welded to a centered steel plate. The extension arm modification is inserted into the existing strongback channel beams and bolted into place. Two extension arms are added to one side of the IPPLA to provide the extra length needed to accommodate the passenger tunnel. The center counterbalance will then be offset about 20 inches to center gravity and therefore maintain horizontal status. The extension arm modification was selected because of minimum cost, low weight, and minimal installation time.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号