首页> 美国政府科技报告 >Innovative Approach Enabled the Retirement of TDRS-1 Compliant with NASA Orbital Debris Requirements
【24h】

Innovative Approach Enabled the Retirement of TDRS-1 Compliant with NASA Orbital Debris Requirements

机译:创新方法使TDRs-1的退役符合Nasa轨道碎片要求

获取原文

摘要

The first Tracking and Data Relay Satellite (TDRS-1) was deactivated on June 27th 2010 following more than 26 years of operation. The end-of-mission (EOM) operations were developed to address the stringent requirements of NPR 8715.6: NASA Procedural Requirements for Limiting Orbital Debris, which consists of three key items: 1) removal from the geosynchronous arc; 2) depletion of the remaining propellant; and 3) passivation of all sources of energy storage or generation (1). The EOM approach minimized risks while accomplishing these goals. Raising TDRS-1 over 350 km above geosynchronous was accomplished via proven station change operations. Depleting propellant was the most challenging task, requiring over 20 hours of thruster on-time accumulated within schedule, orbit, and spacecraft subsystem constraints. The attitude configuration and operational procedures, including the unique final passivation method, were thoroughly analyzed and simulated prior to the start of operations. The complete EOM campaign lasted 21 days. The TDRS-1 EOM campaign demonstrated that pre-NPR 8715.6 satellite designs can be made to comply and that lessons learned could be applied to other satellite designs. The significant TDRS-1 effort demonstrates a commitment by NASA to responsible orbital debris management in compliance with international standards.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号