首页> 美国政府科技报告 >STUDY FOR CLEANLINESS LEVEL REQUIR EMENTS Pon PNEUMATIC AND HYDRAULIC COMPONENTS -SERVICE ARM SYSTEMS, COMPLEX 39
【24h】

STUDY FOR CLEANLINESS LEVEL REQUIR EMENTS Pon PNEUMATIC AND HYDRAULIC COMPONENTS -SERVICE ARM SYSTEMS, COMPLEX 39

机译:研究清洁度等级要求庞大的气动和液压元件 - 维修臂系统,复杂39

获取原文

摘要

This report describes the effort accomplished, both analytical and experimental, under Contract NAS10-5935 to determine the minimum cleanliness levels required for the pneumatic and hydraulic systems on the Launch Complex 39 Service Arms, The study encompassed an in-depth system review, a critical analysis of components with respect to contamination, a literature/industry search to compile pertinent data and experience, and a test program to demonstrate component functional compliance versus contamination.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号