首页> 美国政府科技报告 >Generic event trees and the treatment of dependencies and non-proceduralized actions in a low power and shutdown Probabilistic Risk Assessment
【24h】

Generic event trees and the treatment of dependencies and non-proceduralized actions in a low power and shutdown Probabilistic Risk Assessment

机译:通用事件树以及低功耗和关闭概率风险评估中的依赖关系和非程序化操作的处理

获取原文

摘要

Sandia National Laboratories was tasked by the US Nuclear Regulatory Commission to perform a Probabilistic Risk Assessment (PRA) of a boiling water reactor (BWR) during low power and shutdown (LP&S) conditions. The plant chosen for the study was Grand Gulf Nuclear Station (GGNS), a BWR 6. In performing the analysis, it was found that in comparison with full-power PRAs, the low decay heat levels present during LP&S conditions result in a relatively large number of ways by which cooling can be provided to the core. In addition, because of the less stringent requirements imposed on system configurations possible is large and the availability of plant systems is more difficult to specify. These aspects of the LP&S environment led to the development and use of ''generic'' event trees in performing the analysis. The use of ''generic'' event trees, in turn, had a significant impact on the nature of the human reliability analysis (HRA) that was performed. This paper describes the development of the event trees for the LP&S PRA and important aspects of the resulting HRA.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号