首页> 美国政府科技报告 >TA-59 North Parking Lot and Pajarito Road Corridor Analysis
【24h】

TA-59 North Parking Lot and Pajarito Road Corridor Analysis

机译:Ta-59北停车场和pajarito路走廊分析

获取原文

摘要

The purpose of this report is to provide traffic engineering services for the TA-59 North Parking Lot/Pajarito Road corridor Analysis at Los Alamos National Laboratory. The following tasks were accomplished to assess the development of the north parking lot and Pajarito Road in the vicinity of TA-59: conducted turning-movement counts from 7 AM to 9 AM and from 4 PM to 6 PM at the Pajarito Road/TA-59 intersection; conducted a parking supply and demand survey for all the parking lots within TA-59 on half-hour intervals between 0600--1800 (6 AM to 6 PM); conducted mid-day directional speed study along Pajarito Road, just east or south of the TA-59/Pajarito Road intersection; conducted peak hour gap study on Pajarito Road in the vicinity of TA-59; reviewed the TA-59 Parking Lot North of Pajarito Road, FY-94 Weapons GPP Short List Candidate (number sign)9 report and other documents pertaining to past transportation studies; reassigned current turning-movement volumes with a 100 space parking lot being built on the north side of Pajarito Road; prepared traffic projections for the Pajarito Road/TA-59 intersection according to the proposed development on the north side of Pajarito Road that would employee 246 people; and assigned pedestrian crossing volumes between the northern lot/future development site and areas south of Pajarito Road.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号