首页> 美国政府科技报告 >Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993.
【24h】

Intelligent distributed control for nuclear power plants. Final (third annual) technical progress report, September 1991--June 1993 (September 1989--June 1993): Includes no-cost extension period from September 1992--June 1993.

机译:核电站智能分布式控制。最后(第三次年度)技术进步报告,1991年9月至1993年6月(1989年9月至1993年6月):包括1992年9月至1993年6月的免费延期期。

获取原文

摘要

This project was initiated in September 1989 as a three year project to develop and demonstrate Intelligent Distributed Control (IDC) for Nuclear Power Plants. There were two primary goals of this research project. The first goal was to combine diagnostics and control to achieve a highly automated power plant as described by M.A. Schultz. The second goal was to apply this research to develop a prototype demonstration on an actual power plant system, the EBR-2 steam plant. Described in this Final (Third Annual) Technical Progress Report is the accomplishment of the project's final milestone, an in-plant intelligent control experiment conducted on April 1, 1993. The development of the experiment included: simulation validation, experiment formulation and final programming, procedure development and approval, and experimental results. Other third year developments summarized in this report are: (1) a theoretical foundation for Reconfigurable Hybrid Supervisory Control, (2) a steam plant diagnostic system, (3) control console design tools and (4) other advanced and intelligent control.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号