首页> 美国政府科技报告 >Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE. Detail performance of the J-FCU (25 days extended TSTA loop operation on April - May 1992)
【24h】

Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE. Detail performance of the J-FCU (25 days extended TSTA loop operation on April - May 1992)

机译:在JaERI和美国能源部的合作下,TsTa联合运作。 J-FCU的详细表现(1992年4月至5月延长TsTa循环25天)

获取原文

摘要

A first complete integrated test of the J-FCU (JAERI Fuel Cleanup System) and the ISS (Isotope Separation System) with full four cryogenic distillation columns was performed successfully with 100 grams of tritium. This test was performed as a part of a 25 day TSTA extended loop run on April - May 1992. Through this operation, the J-FCU operated stably and safely. No significant problems was caused on the interaction between the J-FCU and the ISS. J-FCU processed more than 5 N1/min of simulated fusion-fuel exhaust with wide range of impurities and transferred pure hydrogen isotopes to the ISS and exhausted tritium free impurities to the TWT (Tritium Waste Treatment System) continuously. This report describes the detail result of the J-FCU part test under a 25 day TSTA extended loop run and discuss the JFCU performance. (author). (ERA citation 19:006087)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号