首页>
美国政府科技报告
>Increased oil production and reserves from improved completion techniques in the Bluebell Field, Uinta Basin, Utah. First quarterly technical progress report, September 30, 1993--December 31, 1993
【24h】
Increased oil production and reserves from improved completion techniques in the Bluebell Field, Uinta Basin, Utah. First quarterly technical progress report, September 30, 1993--December 31, 1993
The objective of this project is to increase the oil production and reserves in the Uinta Basin, Utah, by demonstration of improved completion techniques in the Bluebell field. Low productivity is attributed to gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Tertiary Green River and Wasatch Formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This phase will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project. Technical progress is described for: outcrop studies of the Green River Formation; subsurface studies of the Bluebell field; and engineering studies of the reservoirs in the Green River Formation and the Wasatch Formation.
展开▼