Anderman/Smith Operating Co. is operating a secondary oil recovery project involving the Carter sandstone in northwest Alabama. The project objectives are: (1) to increase the ultimate economic recovery of oil from the Carter reservoirs, thereby increasing domestic reserves and lessening US dependence on foreign oil; (2) to extensively model, test, and monitor the reservoirs so their management is optimized; and (3) to assimilate and transfer the information and results gathered to other US oil companies to encourage them to attempt similar projects. As a result of waterflood operations at the Central Buff unit, oil production from the Fowler Brasher 7--9 well increased to 40--50 stb/d in late October, and averaged about 45 stb/d in November with no measurable water production. Production at the Fowler Dodson 8--12 was more erratic during the same period. In October, the oil rate for this well increased to nearly 17 stb/d with no reported water production. However, in November the oil production rate declined to about 9 stb/d with an associated average water rate of nearly 17 bpd. Water analysis showed that this produced water was significantly fresher than the connate water produced prior to waterflood operations. This provides evidence for early breakthrough of water injected at the Jones 7--16 well and will be an important consideration in the reservoir modeling study being performed for the unit. There has been essentially no change in the waterflood response at the North Fairview Unit during the last quarter. Oil production rates from the three producing wells have remained unchanged; that is, 3 stb/d for Smith 33-6, 2 stb/d for Perkins 33--11, and 1 stb/d for the Perkins Young 33--10 well.
展开▼