首页> 美国政府科技报告 >New challenges in the safety analysis of DOE's high-level waste tanks
【24h】

New challenges in the safety analysis of DOE's high-level waste tanks

机译:DOE高级废水箱安全分析面临新挑战

获取原文

摘要

Tank 241-SY-101, located at the Department of Energy Hanford Site, has periodically released up to 283 m(sup 3) (10,000 ft(sup 3)) of flammable gas. This release has been one of the highest priority DOE operational safety problems because of potential consequences if the gas were ignited during one of these releases. The gases include hydrogen and ammonia (fuels) and nitrous oxide (oxidizer). There have been many opinions regarding the controlling mechanisms for these releases, but demonstrating an adequate understanding of the problem, selecting a mitigation methodology, and preparing the safety analysis have presented numerous new challenges. The purpose of this report is to present an overview of the problem, the main issues, the method selected to mitigate this hazard, and the results of the mitigation program.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号