首页> 美国政府科技报告 >Project management plan, N Springs expedited response action
【24h】

Project management plan, N Springs expedited response action

机译:项目管理计划,N springs加快了应对行动

获取原文

摘要

In accordance with the past-practice strategy, the US Department of Energy (DOE) is conducting an expedited response action (ERA) at the N Springs, located in the Hanford 100 N Area. This Project Management Plan (PMP) addresses the design and construction of a sheet pile barrier and the design, construction, and operation of an ion-exchanged pump and treat system at N Springs. There were three objectives set for the N Springs ERA, which are outlined in Item 6 in the Senior Executive Agreement Committee Agreement on the Resolution of Milestone M-14-00 Change Request Dispute. The first N Springs ERA objective is to eliminate or substantially reduce the flux of strontium-90 to the N Springs, and ultimately to the Columbia River via groundwater migration. A sheet pile barrier will be installed in the path of groundwater flow, forcing strontium-90 contaminated groundwater to flow around it in order to reach the river, substantially decreasing groundwater flow velocity. Since the strontium transport velocity is approximately 2 orders of magnitude less than that of the groundwater in the vicinity, the flux of strontium-90 to the river will be reduced. The second N Springs ERA objective is to evaluate commercially available treatment options for strontium-90 contaminated groundwater. The third N Spring ERA objective is to provide data necessary to set appropriate strontium-90 contaminated groundwater cleanup standards.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号