首页> 美国政府科技报告 >Electric Power Research Institute, High Sulfur Test Center report to the Steering Committee, March 1994. (Monthly report)
【24h】

Electric Power Research Institute, High Sulfur Test Center report to the Steering Committee, March 1994. (Monthly report)

机译:电力研究所高硫试验中心于1994年3月向指导委员会报告。(月报)

获取原文

摘要

Operations and maintenance continued this month at the Electric Power Research Institute's High Sulfur Test Center. The Suncor Limestone Reagent and Dewatering tests were completed on the Pilot unit this month. As this test block ended, the Pilot unit was modified for the High Velocity Scrubbing tests. This testing began on March 28, 1994 with test PHV-AN. As Phase II of the Mini-Pilot Clear Liquor Scrubbing test block was completed this month, the unit was taken off-line. Testing on the Cold-Side Selective Catalytic Reduction (SCR) unit continued this month as ammonia slip measurements were conducted. Catalyst material from the reactor was inspected and sampled during a scheduled outage this month in preparation for a low temperature test block. (ERA citation 19:029070)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号