首页> 美国政府科技报告 >Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, part 6: Lawrence Livermore National Laboratory working group assessment team report
【24h】

Plutonium working group report on environmental, safety and health vulnerabilities associated with the department's plutonium storage. Volume II, part 6: Lawrence Livermore National Laboratory working group assessment team report

机译:钚工作组报告了与该部门的钚存储相关的环境,安全和健康脆弱性。第二卷,第六部分:劳伦斯利弗莫尔国家实验室工作组评估小组报告

获取原文

摘要

President Clinton directed an Interagency Working Group to initiate a comprehensive review of long-term options for the disposition of surplus plutonium. As part of this initiative, Secretary of Energy Hazel O'Leary directed the Department of Energy to develop options and plans for the interim safe storage of these materials. One step in this direction is a plutonium vulnerability assessment of DOE facilities by a (open quotes)Plutonium Vulnerability Working Group.(close quotes) In this effort, the working group developed a Project Plan and an Assessment Plan which basically laid out the approach and methodology for the assessments. The plans were issued on April 25, 1994. The Project Plan specifies a WGAT for each site with significant holdings of plutonium. Also, the plan requires that each site form a Site Assessment Team (SAT) to provide the self assessment for the project. Additionally, the working group was tasked with managing the assessments at each site, and providing the results in a final report for the Secretary by September 30, 1994.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号