Final Report Integrated DM1200 Melter Testing Using AZ-102 and C-106/AY-102 HLW Simulants: HLW Simulant Verification. VSL-04R5800-1, Rev. 0, 6/27/05.

机译:最终报告使用aZ-102和C-106 / aY-102 HLW模拟器进行集成Dm1200熔化器测试:HLW模拟器验证。 VsL-04R5800-1,Rev。0,6 / 27/05。

获取原文

摘要

The principal objectives of the DM1200 melter tests were to determine the effects of feed rheology, feed solid content, and bubbler configuration on glass production rate and off-gas system performance while processing the HLW AZ-I Oland C-I06/AY-102 feed compositions; characterize melter off-gas emissions; characterize the performance of the prototypical off-gas system components, as well as their integrated performance; characterize the feed, glass product, and off-gas effluents; and perform pre- and post test inspections of system components. The specific objectives (including test success criteria) of this testing, along with how each objective was met, are outlined in the following table. Test objectives are numbered from 1 to 14 and success criteria are listed as 'a' through 'k'.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号