首页> 美国政府科技报告 >Engineering Task Plan for simulated riser installation by use of rotary drilling
【24h】

Engineering Task Plan for simulated riser installation by use of rotary drilling

机译:使用旋转钻井进行模拟立管安装的工程任务计划

获取原文

摘要

This task is being performed to demonstrate the feasibility of the best riser installation alternative identified in the Engineering Study. This Engineering Task Plan (ETP) is the WHC project management plan for the riser installation demonstration activities.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号