首页> 美国政府科技报告 >ITER Building Design (D230-B), Task No. 28. Final report
【24h】

ITER Building Design (D230-B), Task No. 28. Final report

机译:ITER建筑设计(D230-B),任务28号。最终报告

获取原文

摘要

The International Thermonuclear Experimental Reactor (ITER) Project requires a set of buildings, each with its own distinct function, to support ITER's mission. The Joint Central Team (JCT) has identified all the buildings in the set and has placed them in an efficient arrangement on the site. The JCT has developed a conceptual layout of each individual building. The buildings have been categorized into two main groups: (1) (open quotes)Level 1 Buildings(close quotes) which are on the construction schedule critical path and (2) (open quotes)Level 2 Buildings(close quotes) which, while important, are not on the critical path. The buildings are further categorized according to construction material, that is, (open quotes)reinforced concrete(close quotes) or (open quotes)steel-frame on concrete slab(close quotes). This Report responds to the Project's request to perform the initial structural steel design for all the (open quotes)steel-frame on concrete slab(close quotes) buildings. Of the twelve (12) (open quotes)steel-frame on concrete slab(close quotes) buildings, four (4) are Level 1 and eight (8) are Level 2 Buildings. This Report is a deliverable for the ITER Task Assignment entitled (open quotes)ITER Buildings Design (D230-B)(close quotes), also designated as Task No. 28. ITER U.S. Home Team Industrial Consortium members, Raytheon Engineers & Constructors (RE&C) and Stone & Webster Engineering Corporation (SWEC), teamed to perform Task 28. This task commenced in May 1995. It was performed in accordance with the design criteria specified by the ITER-JCT, San Diego Joint Work Site.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号