首页> 美国政府科技报告 >Dynamometer Testing of Samsung 2.5MW Drivetrain. Cooperative Research and Development Final Report
【24h】

Dynamometer Testing of Samsung 2.5MW Drivetrain. Cooperative Research and Development Final Report

机译:三星2.5mW传动系统的测功机测试。合作研究与开发最终报告

获取原文

摘要

SHI's prototype 2.5 MW wind turbine drivetrain was tested at the NWTC 2.5 MW dynamometer test facility over the course of 4 months between December 2009 and March 2010. This successful testing campaign allowed SHI to validate performance, safety, control tuning, and reliability in a controlled environment before moving to full-scale testing and subsequent introduction of a commercial product into the American market.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号