首页> 美国政府科技报告 >Review of Ontario Hydro program to reduce fuel channel gap
【24h】

Review of Ontario Hydro program to reduce fuel channel gap

机译:审查安大略省水电计划,以减少燃料通道差距

获取原文

摘要

The consultant was requested to report on the adequacy of quality assurance activities in the project management, engineering, and manufacturing parts of the project and to review and comment on the technical adequacy of the methods. The program involved three potential solutions or approaches. Each was designed to prevent fuel bundles shifting into the reactor core if there is fuel channel flow reversal. Each approach was also intended to reduce or eliminate fuel vibration and the consequential fretting observed in fuel channels with significant creep. (author). 4 figs. (Atomindex citation 27:051724)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号