首页> 美国政府科技报告 >Video requirements plan for the HMT equipment removal system
【24h】

Video requirements plan for the HMT equipment removal system

机译:HmT设备清除系统的视频要求计划

获取原文

摘要

This document is the plan defining the video coverage requirements for the equipment removal event of the Hydrogen Mitigation Test (HMT) mixer pump currently installed in high level nuclear waste storage Tank 241-SY-101. When the mixer pump fails the removal and installation of a spare pump will be a time critical event. Since the success of the HMT mixer pump has resolved the DOE safety issue it is absolutely essential that mixing be restored to the tank in a short as time possible. Therefore, the removal of the failed pump and the installation of the spare pump must be anticipated and planned well in advance. The removal, containment, transporting, and storage of the failed pump is a very complex and hazardous task. The successful completion of this task will require careful planning and monitoring. Certain events, during the removal and subsequent installation of the new pump, will require video observation and storage for safety, documenting, training, and promotional use. Furthermore, certain events will require close monitoring and observation by the event directors and key supervisory personnel for the execution of specific tasks during the equipment removal event.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号