In situ investigation of the long-term sealing system as component of dam construction (Dam project)

机译:作为大坝施工组成部分的长期密封系统的现场调查(大坝项目)

获取原文

摘要

The project ''In situ investigation of the long term sealing system as a component of a Dam Construction'' started on April 1991. The main objectives of the research to be developed by DIT-UPC group is to model and validate the effects of multiphase flow through the components of the long-term seal and at the interface between the seal and the host rock. These include the following main tasks: -Task 1: State of the art-review -Task 2: Laboratory work -Task 3: Modelling -Task 4: Code verification -Task 5: Validation From these tasks, the main research directions that have been followed are: Constitutive modelling of the mechanical behaviour of porous salt aggregates. Development of a theoretical framework for the study and charaterization of the coupled hydro-thermo-mechanical behaviour of a porous/non-porous saline system. This includes both, establishing the governing equations and the adoption of constitutive laws. The final objective is the development of a numerical simulator able to handle problems in saline environments.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号