首页> 美国政府科技报告 >FGD systems: What utilities chose in phase 1 and what they might choose in phase 2
【24h】

FGD systems: What utilities chose in phase 1 and what they might choose in phase 2

机译:FGD系统:第1阶段的实用程序选择以及第2阶段可能选择的内容

获取原文

摘要

Title IV (acid rain) of the Clean Air Act Amendments of 1990 is imposing new limitations on the emission of sulfur dioxide (SO(sub 2)) and nitrogen oxides (NO(sub x)) from electric power plants. The Act requires utilities to develop compliance plans to reduce these emissions, and indications are that these plans will dramatically alter traditional operating procedures. A key provision of the SO(sub 2) control program defined in Title IV is the creation of a system of emission allowances, with utilities having, the option of complying by adjusting system emissions and allowance holdings. The central focus of this paper is the identification of sulfur dioxide (SO(sub 2)) control options being implemented by the electric utility industry, current compliance trends, synergistic control issues and a discussion of the implications of Phase I decisions for Phase II.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号