Report of a consultants meeting on control rod insertion reliability for WWER-1000 nuclear power plants. Extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

机译:关于WWER-1000核电厂控制棒插入可靠性的顾问会议的报告。关于WWER和RBmK核电厂安全的预算外计划

获取原文

摘要

Starting from 1992, an increased drop time of control rods exceeding the design limit of four seconds has been observed in most of the operating WWER-1000 reactors in Russia and in the Ukraine. In some cases a dropped control rod became stuck in an intermediate position near the bottom of the core. In October 1994, a similar control rod problem was also observed at Unit 6 of the Kozloduy NPP. The issue of control rod insertion reliability was considered at a consultants' meeting on 'Core Control and Protection Strategy of WWER-1000 Reactors' in April 1994. A consultants' meeting specifically focused on 'Control Rod Insertion Reliability' was convened in Vienna in February 1995 attended by 15 international experts. The objectives of this meeting were: The exchange of international experience on problems and solutions related to anomalous control rod insertion; judgement of the safety concern of this issue for WWER-1000 reactors based on safety analyses; consideration of regulatory requirements and interim measures to continue operation in short term including modifications implemented or planned; and, status of root cause analyses and pending problems. The technical discussions were held in plenary sessions and in three working groups devoted to specific aspects of the issue. Refs, figs, tabs. (Atomindex citation 28:053658)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号