首页> 美国政府科技报告 >CeraMem NOx catalytic filter 5000 ACFM field demonstration test plan: Engineering development of a coal-fired low emissions boiler system: Subtask 9.2, Subsystem test plan
【24h】

CeraMem NOx catalytic filter 5000 ACFM field demonstration test plan: Engineering development of a coal-fired low emissions boiler system: Subtask 9.2, Subsystem test plan

机译:Ceramem NOx催化过滤器5000 aCFm现场演示测试计划:燃煤低排放锅炉系统的工程开发:子任务9.2,子系统测试计划

获取原文

摘要

As a deliverable of the project, ABB Environmental Systems has written this subsystem test plan to outline and detail activities to be undertaken in Tasks 10 and 11 of the Low Emissions Boiler System project. This subsystem test plan includes the budget and schedule for the construction, modification, and operation of the subsystem test unit. This subsystem test plan also discusses securing of all applicable construction and operating permits, completing all necessary agreements with any host facilities, management procedures for monitoring and controlling all procurement and construction activities, implementation of Quality Assurance/Quality Control (QA/QC) measures, data acquisition during operations, data analysis, and the startup and shutdown procedures of the test unit. The subsystem test plan is part of the updated Phase II RD&T Plan.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号