首页> 美国政府科技报告 >Increased oil production and reserves from improved completion techniques in the Bluebell field, Uinta Basin, Utah. Tenth quarterly technical progress report, January 1, 1996--March 31, 1996. Revised
【24h】

Increased oil production and reserves from improved completion techniques in the Bluebell field, Uinta Basin, Utah. Tenth quarterly technical progress report, January 1, 1996--March 31, 1996. Revised

机译:1996年1月1日至1996年3月31日的第十季度技术进步报告。修订了犹他州Uinta盆地Bluebell油田完井技术的石油产量和储量。

获取原文

摘要

The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin will is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil- bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch Formations in the Bluefell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project. Data (net pay thickness, porosity, and water saturation) of more than 100 individuals beds in he lower Green River and Wasatch Formations were used to generate geostatistical realization (numerical- representation) of the reservoir properties. The data set was derived from the Michelle Ute and Malnar Pike demonstration wells and 22 other wells in a 20 (52 km(sup 2)) square-mile area. Beds were studied independently of each other. Principles of sequential Gaussian simulations were used to generate geostatistical realizations of the beds.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号