首页> 美国政府科技报告 >U.S. Army Engineer Waterways Experiment Station (WES) support to Department of Energy Rocky Flats Facility (DOE RFO) saltcrete processing. Progress report, April 15--September 30, 1995
【24h】

U.S. Army Engineer Waterways Experiment Station (WES) support to Department of Energy Rocky Flats Facility (DOE RFO) saltcrete processing. Progress report, April 15--September 30, 1995

机译:美国陆军工程师航道实验站(WEs)支持能源部Rocky Flats Facility(DOE RFO)盐场处理。进展报告,1995年4月15日至9月30日

获取原文

摘要

This report summarizes work authorized for technical and scientific support to waste cementation and saltcrete processing operations. During this report period, the remaining tasks described in the agreement were completed and the project was closed. Accomplishments are summarized. The bulk of this report is a paper entitled ''Salt related expansion reactions in portland-cement-based waste forms.''

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号