Evaluation of gas-reburning and low NO(sub x) burners on a wall fired boiler. Progress report, January 1--March 31, 1996

机译:评估燃气锅炉上的气体再燃和低NO(亚x)燃烧器。进展报告,1996年1月1日至3月31日

获取原文

摘要

The primary objective of this Clean Coal Technology project is to evaluate the use of Gas Reburning and Low NO(sub x) Burners (GR-LNB) for NO(sub x) emission control from a wall fired boiler. This project is being conducted in three phases at the host site, a 172 MW(sub e) wall fired boiler of Public Service Company of Colorado, Cherokee Unit 3 in Denver, Colorado: Phase I, design and permitting has been completed on June 30, 1992; Phase II, construction and start-up has been completed on September 1991; and Phase III, operation, data collection, reporting and disposition. Phase III activities during this reporting period involved the following: compilation, analysis and assembly of the final report and initiation of restoration activities; restoration of the gas reburning system involving removal of the flue gas recirculation system (permanent Second Generation Gas Reburning); and participants meeting and reburning workshop. Long term testing of the equipment demonstrated an average NO(sub x) reduction of 65% using 18% gas heat input. After removing the flue gas recirculation system, (Second Generation GR), an average NO(sub x) of 64% was achieved using 13% gas heat input. The project goal of 70% reduction was achieved, but no on an average basis due to the load requirements of the utility.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号