首页> 美国政府科技报告 >Hazard classification for the 200-ZP-1 Operable Unit Phase 2 and 3 interim remedial measure
【24h】

Hazard classification for the 200-ZP-1 Operable Unit Phase 2 and 3 interim remedial measure

机译:200-Zp-1可操作单元第2阶段和第3阶段临时补救措施的危险分类

获取原文

摘要

This safety assessment documents the Final Hazard Classification (FHC) for Phase 2 and 3 interim remedial measure (IRM) activities to be conducted in the 200 West Area of the Hanford Site. The 200-ZP-1 Phase 2 and 3 IRM activities will involve the air stripping of carbon tetrachloride (CCl4) from extracted groundwater using a packed-bed stripper column followed by gas-phase adsorption of the CCl4 from the stripper off-gas onto a granular activated carbon (GAC) bed. For Phase 2, which includes the initial year of operation, it is planned to operate the stripper at 568 L/min (150 gal/min). The process flow diagram for the Phase 2 and 3 system is shown.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号