首页> 美国政府科技报告 >Effective use of risk assessments and the public comment process to achieve acceptable remediation goals for mercury-contaminated sites
【24h】

Effective use of risk assessments and the public comment process to achieve acceptable remediation goals for mercury-contaminated sites

机译:有效利用风险评估和公众意见征询流程,为汞污染场地实现可接受的补救目标

获取原文

摘要

As a result of recalculating risk levels using new information, the remediation goals and cleanup strategy for the Lower East Fork Poplar Creek floodplains have been significantly changed to reflect an important reduction in cleanup costs while ensuring protection of human health and the environment. The remediation goal initially set at 50 ppM Hg has been changed to 400 ppM, resulting in significant reductions in both the destruction of the floodplain landscape and project costs. Volume of soils to be excavated has been decreased from 1 million cubic yards to 25,000 cubic yards, and the cost has been reduced from about $1 billion to less than $20 million.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号