首页> 美国政府科技报告 >Reprocessing of seismic shear wave and TDEM data collected at the A&M areas of the Savannah River Plant. Final report, September 1992--December 1995
【24h】

Reprocessing of seismic shear wave and TDEM data collected at the A&M areas of the Savannah River Plant. Final report, September 1992--December 1995

机译:在萨凡纳河工厂的a&m地区收集的地震剪切波和TDEm数据的再处理。最后报告,1992年9月至1995年12月

获取原文

摘要

The upper aquifers in the A&M area of the Savannah River Site are known to be contaminated by chlorinated solvents. Remediation plans depend critically on continuity of a confining zone known as the Crouch Branch Confining Unit (C8CU), which occurs at depths between about 250 feet and 300 feet. Surface and borehole geophysical methods were tested and further developed between 1993 and 1995 to map the lithology (clay content) and stratigraphy of the CBCU. It was found that time domain electromagnetics (TDEM) soundings were effective in mapping lithology and changes in lithology, and shear (S-) wave reflection surveys were effective in mapping stratigraphy. An integrated interpretation of the two methods yielded a rather complete image of lithology and stratigraphy of the CBCU.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号