首页> 美国政府科技报告 >Retrofit of waste-to-energy facilities equipped with electrostatic precipitators. Volume III: Test protocol
【24h】

Retrofit of waste-to-energy facilities equipped with electrostatic precipitators. Volume III: Test protocol

机译:改造配备静电除尘器的废物转化能源设施。第三卷:测试协议

获取原文

摘要

The American Society of Mechanical Engineers' (ASME) Center for Research and Technology Development (CRTD) has been awarded a subcontract by the National Renewable Energy Laboratory (NREL) to demonstrate the technical performance and viability of flue gas temperature control in combination with dry acid gas reagent and activated carbon injection at an existing electrostatic precipitator (ESP) equipped municipal waste combustor (MWC). The objective of this proof-of-concept demonstration test is to economically and reliably meet 40 CFR 60 Subpart Cb Emissions Guidelines for MWC's at existing ESP equipped facilities. The effort is being directed by a Subcommittee of tile ASME Research Committee on Industrial and Municipal Wastes (RCIMW) chaired by Dave Hoecke. Mr. Greg Barthold of ASME/CRTD is the Project Manager. ASME/CRTD contracted with Rigo & Rigo Associates, Inc. in cooperation with A.J. Chandler & Associates, Ltd. to be the Principal Investigator for the project and manage the day-to-day aspects of the program, conduct the testing reduce and interpret the data and prepare the report. Testing will be conducted at the 2 by 210 TPD, ESP equipped MWC at the Davis County Resource Recovery Facility in Layton, Utah. The test plan calls for duplicate metals (Cd, Pb and Hg), dioxin and acid gas runs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号