首页> 美国政府科技报告 >Final characterization report for the 104-B-1 Tritium Vault and 104-B-2 Tritium Laboratory
【24h】

Final characterization report for the 104-B-1 Tritium Vault and 104-B-2 Tritium Laboratory

机译:104-B-1 Tritium Vault和104-B-2氚实验室的最终特性报告

获取原文

摘要

This report is a compilation of the characterization data collected from the 104-B-1 Tritium Vault and the 104-B-2 Trillium Laboratory. The characterization activities were organized and implemented to evaluate the radiological status and identify any hazardous materials. The data contained in this report reflects the current conditions and status of the 104-B-1 Tritium Vault and 104-B-2 Tritium Laboratory. This information is intended to be utilized in support of future building decontamination and demolition, to allow for proper disposal of the demolition debris as required by the Washington Administrative Code, WAC 173-303, the Hanford Site Solid Waste Acceptance Criteria, WHC-EP-0063, and the Environmental Restoration Disposal Facility Waste Acceptance Criteria, BHI-00139. Based on the historical information and facility inspections, the only hazardous materials sampling and analysis activities necessary were to identify lead paint and asbestos containing materials (ACM) in the 104-B-1 Tritium Vault and the 104-B-2 Tritium Laboratory. Asbestos samples were obtained from the outer boundary of the roof areas to confirm the presence and type of asbestos containing fibers. Lead paint samples were obtained to confirm the presence and quantity of lead paint on the roof trim, doors and vents.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号