首页> 美国政府科技报告 >Progress of the Front-End System Development for Project X at LBNL Conference: Presented at the 3rd International Particle Accelerator Conference (IPAC-2012), New Orleans, Louisiana, 20-25 May 2012.
【24h】

Progress of the Front-End System Development for Project X at LBNL Conference: Presented at the 3rd International Particle Accelerator Conference (IPAC-2012), New Orleans, Louisiana, 20-25 May 2012.

机译:LBNL会议项目X前端系统开发进展:于2012年5月20日至25日在路易斯安那州新奥尔良举行的第三届国际粒子加速器大会(IpaC-2012)上发表。

获取原文

摘要

A multi-MW proton facility, Project X has been proposed and is currently under development at Fermilab. Project X is a key ingredient of an accelerator complex for intensity frontier of future high energy physics programs in the US. In collaboration with Fermilab, LBNL takes the responsibility in the development and design studies of the front-end system for Project X. The front-end system would consist of H- ion source(s), low-energy beam transport (LEBT), 162.5 MHz normal conducting CW Radio-Frequency-Quadrupole (RFQ) accelerator, medium-energy beam transport (MEBT), and beam chopper(s). In this paper, we will review and present recent progress of the front-end system studies, which will include the RFQ beam dynamics design, RF structure design, thermal and mechanical analyses and fabrication plan, LEBT simulation studies and concept for LEBT chopper.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号