首页> 美国政府科技报告 >First on-line results for As and F beams from HRIBF target/ion sources
【24h】

First on-line results for As and F beams from HRIBF target/ion sources

机译:来自HRIBF目标/离子源的as和F光束的首次在线结果

获取原文

摘要

The first on-line tests of the ion sources to provide radioactive ion beams of (sup 69,70)As and (sup 17,18)F for the Holifield Radioactive Ion Beam Facility have been performed using the UNISOR facility at HRIBF. For (sup 70)As the measured efficiency is 0.8 (+-) 0.3% with a hold-up time of 3.6 (+-) 0.3 hours as measured with (sup 72)As at a target temperature of 1,270 C. For (sup 17)F the efficiency for Al(sup 17)F is 0.0024 (+-) 0.0008% with a hold-up time of 16.4 (+-) 0.8 m as measured with Al(sup 18)F at a target temperature of 1,470 C.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号