首页> 美国政府科技报告 >Civil engineering: calculations of pre-stressed concrete structures using Code(sub A)ster.
【24h】

Civil engineering: calculations of pre-stressed concrete structures using Code(sub A)ster.

机译:土木工程:使用Code(sub a)ster计算预应力混凝土结构。

获取原文

摘要

This document presents an analysis of the different calculation methods for pre-stressed concrete structure which can be performed by using finite element methods. Two methods of calculating the pre-stressing of concrete structures with finite elements have been determined. The equivalent method which consists of replacing the action of pre-stressing the concrete by equivalent forces. These method is well suited to dimensioning and studying the overall stability of a structure. It is not an easy matter to take into account the coupled or time-varying phenomena. This approach ignores the evolution of the interaction between the pre-stressing and the concrete. The explicit method which consists of including the mechanical resolution of the pre-stressed cables in that of a concrete structure. Not only does this allow a local study of the pre-stressed to be made, it also allows the coupling which developed over time to be determined, e.g. slip, deferred deformation and coupling between the steel and concrete behaviours. This method enables non-linear phenomena with varying degrees of complexity, such as fracture or yielding of the steels, drying out of the concrete, creep, etc to be described. The two methods are complementary. This document presents the mathematical and computer developments relating to each of this method. In the case of the explicit method, certain of the Code- Aster functions already make it possible to meet several EDF application requirements. Several couplings can be taken into account, such as thermomechanical, shrinkage in drying, creep, relaxation and injection of the cables. Three immediate developments of Code-Aster are proposed for the following applications: - a procedure for calculating the pre-stress losses along the pre-stressing cables; - a command to allocate these forces in the form of an initial force field in the bar elements associated with the cables; - a procedure for linking elements whose nodes do not coincide with each other and for connecting the cabling meshing with the concrete structure meshing 24 refs., 13 figs., 1 tab.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号