首页> 美国政府科技报告 >RLA room 20 cleanout and stabilization
【24h】

RLA room 20 cleanout and stabilization

机译:RLa房间20清理和稳定

获取原文

摘要

This engineering report documents the decontamination and stabilization of the Rupture Loop Annex located in room 20 of the 309 building's Plutonium Recycle Test Reactor. Low level, mixed, and recyclable waste was removed from the room. Smearable contamination was removed and/or fixed in place with paint. The RLA was cleaned out and stabilized to meet the Environmental Restoration Contractor's turnover criteria.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号