首页> 美国政府科技报告 >TWRS privatization Phase I site development design requirements document
【24h】

TWRS privatization Phase I site development design requirements document

机译:TWRs私有化第一阶段网站开发设计要求文件

获取原文

摘要

The DOE-RL is pursuing a strategy of hiring private contractors for treatment of Hanford Site tank wastes. This strategy is called privatization and includes design, permitting, construction, operation and deactivation of facilities for tank waste treatment. The TWRS Privatization Infrastructure Project consists of several sub-projects which will provide key services needed to support the privatization mission. This document identifies the design requirements for the site development sub-project, including construction, power, water, and road modifications. It will be used in development of the project's conceptual design.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号