首页> 美国政府科技报告 >Tank 241-T-201, core 192 analytical results for the final report
【24h】

Tank 241-T-201, core 192 analytical results for the final report

机译:坦克241-T-201,核心192分析结果为最终报告

获取原文

摘要

This document is the final laboratory report for Tank 241-T-201. Push mode core segments were removed from Riser 3 between April 24, 1997, and April 25, 1997. Segments were received and extruded at 222-S Laboratory. Analyses were performed in accordance with Tank 241-T-201 Push Mode Core Sampling and Analysis Plan (TSAP) (Hu, 1997), Letter of Instruction for Core Sample Analysis of Tanks 241-T-201, 241-T-202, 241-T-203, and 241-T-204 (LOI) (Bell, 1997), Additional Core Composite Sample from Drainable Liquid Samples for Tank 241-T-2 01 (ACC) (Hall, 1997), and Safety Screening Data Quality Objective (DQO) (Dukelow, et al., 1995). None of the subsamples submitted for total alpha activity (AT) or differential scanning calorimetry (DSC) analyses exceeded the notification limits stated in DQO. The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems Technical Basis Group, and are not considered in this report.

著录项

  • 作者

    Nuzum, J. L.;

  • 作者单位
  • 年度 1997
  • 页码 1-458
  • 总页数 458
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

    Tanks ; Testing;

    机译:坦克;测试;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号