首页> 美国政府科技报告 >Delivery and installation of PC/FRAM at the PNC Tokai Works
【24h】

Delivery and installation of PC/FRAM at the PNC Tokai Works

机译:在pNC东海工厂交付和安装pC / FRam

获取原文

摘要

The authors report on the assembly, testing, delivery, installation, and initial testing of three PC/FRAM plutonium isotopic analysis systems at the Power Reactor and Nuclear Fuel Development Corporation's Tokai Works. These systems are intended to measure the isotopic composition and (sup 235)U/plutonium of mixed oxide (MOX) waste in 200-L waste drums. These systems provide capability for performing measurements on lead-lined drums.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号