首页> 美国政府科技报告 >Final deactivation report on the radioisotope production Lab-H, Building 3118, at Oak Ridge National Laboratory, Oak Ridge, Tennessee
【24h】

Final deactivation report on the radioisotope production Lab-H, Building 3118, at Oak Ridge National Laboratory, Oak Ridge, Tennessee

机译:关于放射性同位素生产的最终停用报告,位于田纳西州橡树岭橡树岭国家实验室的3118号楼Lab-H

获取原文

摘要

This report outlines the activities conducted to place the facility in a safe and environmentally sound condition for transfer to the DOE Office of Environmental Restoration Program (EM-40). This report provides a history and profile of Bldg. 3118 prior to and after deactivation. Turnover items (e.g. Surveillance & Maintenance Plant, remaining materials, etc.) are discussed. Building 3118 was stabilized during deactivation so that when transferred to the EM-40 program, only minimal S&M is required (other than that, the building will be unoccupied and the exterior doors locked).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号